Yuan Ji Enterprises Pte Ltd (YJE) specialise in civil engineering works covering pipe laying, cable installation, HDD and road reinstatement projects.
Trenching / Excavation works for underground pipe laying and road reinstatement
Inclusive of both Distribution and Transmission network:
High Tension (6.6kV or 22 kV)
Extra High Tension (66 kV)
Ultra High Tension (230kV, 400kV)
Using Horizontal Directional Drilling (HDD) Machine
MEMS-gyroscope based mapping tool specifically developed for generating accurate As-Built maps of short duct segments.
Fast and efficient way to map all types of pipe in 3D
No measurements from the surface
All sizes of pipe from 80 mm. I. D.
Up to 300 meters length - any depth
Good accuracy in three dimensions
Maps available in CAD or GIS format